To maintain the stability of the building, we had to replace or partially restore some posts. To be prepared for earthquakes or other impending instabilities, we have developed a new grid system that absorbs horizontal forces. The termite damage is treated with epoxy, as we did not want to replace all the parts. All new parts are manufactured using traditional methods and are used without metal compounds. Adam Zgola specializes in restoring or even constructing new buildings using traditional methods. Without his knowledge and skills it would not be possible to realize such a project. I say this with over 15 years of experience in exhibition construction and collaboration with countless craftsmen in Austria, Italy, China, Finland and Switzerland.